DualLite LG125R Installation Instructions And User Manual Download Page 3

3

Table of Contents

Description Page

Section 100

System Installation Instructions

101........ Unit Specification ................................................................................................................. 4 

102. ...... Receiving, Moving and Storing Systems and Batteries ....................................................... 5

102.1.....  Shipping Damage ............................................................................................................... 5

102.2 .... Temporary Storage of Units and Batteries ........................................................................... 5

103. ...... Installation Requirements .................................................................................................... 5

103.2 .... High Altitude Operation ........................................................................................................ 5

104. ...... Cabinet Mounting ................................................................................................................. 6

104.1 .... Tools Required ..................................................................................................................... 6

104.2 .... Mounting Hardware ............................................................................................................. 6

104.3 .... Knockout Locations ............................................................................................................. 6

104.4 .... Cabinet Mounting - Surface (-S) Models ............................................................................. 6

104.5..... Cabinet Mounting - Surface (-R) Models ............................................................................. 7

104.6..... Cabinet Mounting - Surface (-T) Models .............................................................................. 7

105. .......AC Connectors .................................................................................................................... 8

105.1 .... AC Wiring Preparations ....................................................................................................... 8

105.2 .... AC Input and AC Output Connections ................................................................................. 8

...............Wiring Diagram 1 - 120VAC Connections ........................................................................... 9

...............Wiring Diagram 2 - 277VAC Connections ........................................................................... 9

106.........Battery Information .............................................................................................................. 10

106.1......Tools .................................................................................................................................... 10

106.2......Battery Installation and Connections ................................................................................... 10

...............Wiring Diagram ................................................................................................................... 10

106.3......Battery Connection Voltage Check ..................................................................................... 10

107.........Final Installation Checklist ................................................................................................... 12

108. .......System Start-Up Procedure ................................................................................................ 12

109........ Manual System Test ............................................................................................................ 12

109.1 .... For LG125 and LG250 Models ............................................................................................ 12

109.2......For LG250SI Model ............................................................................................................. 12

110. ........System Self-Test/Diagnostics .............................................................................................. 13

110.1 ..... Self-Test / Diagnostic Functions .......................................................................................... 13

110.2 ......Self-Test / Diagnostic Indication .......................................................................................... 13

Section 200

Maintenance

200.1......Safe Shut Down Procedure ................................................................................................. 14

200.2......Routine System Maintenance ............................................................................................. 14

200.3......Manual Routine Inverter Tests ............................................................................................ 14

200.4......Replacement Fuses ............................................................................................................ 15

200.5......Routine Battery Inspection and Maintenance ..................................................................... 15

200.6......Battery Replacement Procedure ......................................................................................... 15

200.7......Battery Disposal .................................................................................................................. 15

Summary of Contents for LG125R

Page 1: ...r 125VA 110W 250VA 220W Mini Inverter Power Systems Models LG125S Surface Mounted Version LG125R Recessed Wall Mounted Version LG125T Recessed Ceiling T Grid Mounted Version LG250S Surface Mounted Ver...

Page 2: ...uipment should be mounted in locations where it will not be readily subjected to tampering by unauthorized personnel 7 The use of accessory equipment not recommended by the manufacturer may cause an u...

Page 3: ...Output Connections 8 Wiring Diagram 1 120VAC Connections 9 Wiring Diagram 2 277VAC Connections 9 106 Battery Information 10 106 1 Tools 10 106 2 Battery Installation and Connections 10 Wiring Diagram...

Page 4: ...solator Standard battery Sealed lead calcium 10 year life Battery voltage 24 or 48 system dependent See Table 1 below Runtimes 90 minutes standard Operating temperature 20 C to 30 C 68 F to 86 F Relat...

Page 5: ...ent caps and into the air Do not allow smoking sparks or flames in battery storage location because hydrogen is concentrated under the vent cap of each cell of the battery Hydrogen is highly explosive...

Page 6: ...its and damage the equipment NOTE Consider unit knockout locations prior to mounting unit Allow room for easy routing of conduit to entry point 104 4 Surface Mount Models LG125S LG250S and LG250SI 1 R...

Page 7: ...ent of unit cover the LED indicator panel assembly position must be adjusted to sit flush against inside surface of cover after attachment This is accomplished using the 2 8 32 hex nuts on the indicat...

Page 8: ...Switch S2 is in the OFF position 2 Make sure the LG inverter system input and output voltages are correct for the particular application Remember that the LG system provides single phase power only 3...

Page 9: ...77V wiring Normally On and Normally Off Operation A combination of the operating modes described above See C in Wiring Diagram 1 for 120V wiring or G in Wiring Diagram 2 for 277V wiring Switched Load...

Page 10: ...void electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated battery terminals 8 A qualified electrician who is famil...

Page 11: ...rrect polarity on the battery terminals Polarity markings may vary from battery to battery Battery Wiring Diagram 1 Battery Wiring Diagram 2 Battery Wiring Diagram 3 106 3 Battery Connection Voltage C...

Page 12: ...en to follow the steps below in their exact sequence Failure to do so may result in possible equipment failure CAUTION Familiarize yourself with the shut down procedure in Section 200 1 before proceed...

Page 13: ...s a service alert Refer to the INDICATION chart in Section 110 2 for details During loss of normal utility power the dual color LED will not be illuminated The AMBER INV ON LED indicator will be illum...

Page 14: ...ded if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to assure the unit will operate properly 200...

Page 15: ...stem and to maintain proper charger operation replace spent batteries only with cells having the same part number voltage and ampere hour rating as the original batteries 1 Follow the proper shut down...

Page 16: ...Hubbell Lighting Inc brand with representatives offices in principal cities throughout North America Copyright Hubbell Lighitng Inc All Rights Reserved Specifications subject to change without notice...

Reviews: