200.5 Routine Battery Inspection and Maintenance

Sealed Lead-Calcium Batteries

Lead-Calcium cells are the most common type of battery used today in standby equipment. By design it is as 

maintenance free as a battery can be. It is recommended, however, that some simple steps be taken to increase 

system life and maximize reliability:

A)  A quarterly visual check of the batteries should be conducted to look for deformities in the cases and terminal corro-

sion. Any defective batteries should be replaced. All corroded terminals, regardless how slight, are to be cleaned and 

retightened at once to prevent failure of the entire battery bank.

B)  Once a year, all battery connections should be checked for tightness and re-tightened if necessary.

200.6 Battery Replacement Procedure

WARNING:

Always use the same quantity and type of battery as replacements.

Substituting batteries not supplied by the Manufacturer will void the UL listing of the system and may cause equipment 

failure. To ensure the superior performance of your LG inverter system and to maintain proper charger operation, 

replace spent batteries only with cells having the same part number, voltage and ampere-hour rating as the original 

batteries.

1)  Follow the proper shut down procedure as described in Section 200.1.

2)  Disconnect the battery string beginning with the white inter-cell connectors followed by the red (B+) and black (B-) 

connectors.

3)  Remove the batteries from the cabinet.

4)  Install new batteries following the instructions outlined in Section 106.2.

200.7 Battery Disposal

WARNINGS:

•  Do not dispose of batteries in a fire, the batteries could explode.

•  Do not open or mutilate batteries.

•  Released electrolyte is highly toxic and harmful to the skin and eyes.

CAUTION: Batteries contain lead. Many state and local governments have regulations about used battery 

disposal. Please dispose of the batteries properly.

200.4 Replacement Fuses

DC fuse:

BATT. (+) INPUT

 For LG125S, R & T, 

LG250S & LG250SI 

1) Bussmann MDA-10-R

AC Fuse:

120V OUTPUT

 For LG125S, R & T

0.6A, 300V Time Delay

1)Bussmann GMF-6/10

2) Littlefuse LMF-6/10

 For LG250S, LG250SI

2.8A, 300V Time Delay

1) Bussman GMF-2-8/10

2) Littlefuse LMF-2-8/10

AC Fuse:

277V OUTPUT

 For LG125S, R & T , 

LG250S & LG250SI 

1.6A, 300V Time Delay

1)Bussmann GMF 1-6/10

2) Littlefuse LMF 1-6/10

Summary of Contents for LG125R

Page 1: ...r 125VA 110W 250VA 220W Mini Inverter Power Systems Models LG125S Surface Mounted Version LG125R Recessed Wall Mounted Version LG125T Recessed Ceiling T Grid Mounted Version LG250S Surface Mounted Ver...

Page 2: ...uipment should be mounted in locations where it will not be readily subjected to tampering by unauthorized personnel 7 The use of accessory equipment not recommended by the manufacturer may cause an u...

Page 3: ...Output Connections 8 Wiring Diagram 1 120VAC Connections 9 Wiring Diagram 2 277VAC Connections 9 106 Battery Information 10 106 1 Tools 10 106 2 Battery Installation and Connections 10 Wiring Diagram...

Page 4: ...solator Standard battery Sealed lead calcium 10 year life Battery voltage 24 or 48 system dependent See Table 1 below Runtimes 90 minutes standard Operating temperature 20 C to 30 C 68 F to 86 F Relat...

Page 5: ...ent caps and into the air Do not allow smoking sparks or flames in battery storage location because hydrogen is concentrated under the vent cap of each cell of the battery Hydrogen is highly explosive...

Page 6: ...its and damage the equipment NOTE Consider unit knockout locations prior to mounting unit Allow room for easy routing of conduit to entry point 104 4 Surface Mount Models LG125S LG250S and LG250SI 1 R...

Page 7: ...ent of unit cover the LED indicator panel assembly position must be adjusted to sit flush against inside surface of cover after attachment This is accomplished using the 2 8 32 hex nuts on the indicat...

Page 8: ...Switch S2 is in the OFF position 2 Make sure the LG inverter system input and output voltages are correct for the particular application Remember that the LG system provides single phase power only 3...

Page 9: ...77V wiring Normally On and Normally Off Operation A combination of the operating modes described above See C in Wiring Diagram 1 for 120V wiring or G in Wiring Diagram 2 for 277V wiring Switched Load...

Page 10: ...void electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation Do not touch uninsulated battery terminals 8 A qualified electrician who is famil...

Page 11: ...rrect polarity on the battery terminals Polarity markings may vary from battery to battery Battery Wiring Diagram 1 Battery Wiring Diagram 2 Battery Wiring Diagram 3 106 3 Battery Connection Voltage C...

Page 12: ...en to follow the steps below in their exact sequence Failure to do so may result in possible equipment failure CAUTION Familiarize yourself with the shut down procedure in Section 200 1 before proceed...

Page 13: ...s a service alert Refer to the INDICATION chart in Section 110 2 for details During loss of normal utility power the dual color LED will not be illuminated The AMBER INV ON LED indicator will be illum...

Page 14: ...ded if not routinely recharged NOTE To turn power back on follow the System Start up Procedure outlined in Section 108 Be sure to complete all of the steps to assure the unit will operate properly 200...

Page 15: ...stem and to maintain proper charger operation replace spent batteries only with cells having the same part number voltage and ampere hour rating as the original batteries 1 Follow the proper shut down...

Page 16: ...Hubbell Lighting Inc brand with representatives offices in principal cities throughout North America Copyright Hubbell Lighitng Inc All Rights Reserved Specifications subject to change without notice...

Reviews: