Unit Operation
Operation Precautions
DryGair Energies Ltd
.
26
6.
UNIT OPERATION
The operation chapter explains how to use the DryGair unit.
Note
Operating the unit should be done only after receiving training from the
representative of DryGair.
6.1
Operation Precautions
Before operating the unit, verify you are familiar with the following:
•
The locations of the main shut off switches in case of emergency.
•
The hazards areas and moving parts of the unit.
Warning
Opening the electric compartment should only be done by authorized
personnel or a certified electrician.
•
What is behind each cover, and risks related to that area.
•
The electrical compartment: high voltage and low voltage areas.
•
Operating the unit and stopping the unit.
•
The climate control system (if applicable).
Caution
According to the kind of work being performed on the unit, wear personal
protection devices such as helmet, eye protection glasses, protection shoes,
ears noise protection, etc. All according to state law and regulation and/or
according to management instructions.
Caution
Prevent unauthorized personnel from being near the unit without a
qualified person.
Caution
If the unit was tilted during its transportation, leave the unit in its
vertical position for at least 3 hours before operating. This will ensure the
oil drains back to the bottom of the compressor.