DryGair Dehumidification Unit Model DG-X
Installation
Ver. 12/2020
9
4.1.2
Required Utilities
Prepare the installation site before receiving the DryGair unit.
•
Prepare a concrete leveled surface or hanging construction, built
according to the unit dimensions and weight (see details in Appendix A).
•
Prepare a 2-pole 40 Amp circuit breaker in a protected location near the
unit.
•
Prepare drainage for removing the water that is condensed by the unit.
The unit is supplied with a short (1.5 m/5 feet) tube connected to a 1/2"
BSP threaded plastic bushing.
Warning
The unit condensation water is not for drinking!
•
If the unit is to be connected to a concrete ceiling, the site should be
equipped with suitable climbing equipment to enable safe and
comfortable access to the unit.
•
The transit lanes inside the closed structure where the unit is to be
installed must be kept clear, and the floor must be clean and free from
any obstacles that might cause the forklift, truck,
or crane to “jump”.