![DryGair DG-X Installation, Operation And Maintenance Manual Download Page 18](http://html.mh-extra.com/html/drygair/dg-x/dg-x_installation-operation-and-maintenance-manual_2533277018.webp)
Installation
Transporting the Unit
DryGair Energies Ltd
.
12
4.2.2
Special Instructions for Tilting the Unit
The unit can temporarily be carried at an angle inside the room, under the
following precautions:
Caution
Do not tilt the unit to more than 75 degrees from its vertical position.
Preparing the Unit:
1.
Ensure the compressor connecting screws are tightly closed.
2.
Secure the compressor:
▪
With a belt to a firm part of the unit structure to avoid overweight on
the compressor's screws.
Or
▪
Place a piece of wood in the gap between the compressor and the unit
side post, to support the compressor's high end.
3.
Verify the panels of the unit top fans are mounted well.
4.
Protect the coils with polystyrene or plywood.
Caution
If the unit is tilted during its transportation, leave the unit in its vertical
position for at least 3 hours before operating. This will ensure the oil
drains back to the bottom of the compressor.