11
9. MAINTENANCE PROCEDURES
The pump does not require special tools for any check and/or maintenance operations. In any case, it is recommended to
use suitable equipment and personal protective equipment (gloves, protection goggles, etc.) that in good condition in
accordance with applicable regulations to avoid injury or damage to parts of the pump.
The unit has been designed and built in such a way that it requires a minimum level of required maintenance.
Nevertheless, it is recommended to always keep the body of the equipment clean and periodically check the tube joints
in order to be able to readily detect any leaks.
9.1 SCHEDULED MAINTENANCE
The following table lists the periodic inspections, the frequency and the intervention that the maintenance will have to
carry out in order to ensure the efficiency of the system over time.
CHECK
FREQUENCY
INTERVENTION
Attachment of the lines
After the first 500 hours of operation
Every 1500 hours of operation
Check the joint fittings.
Check the fastening to the parts of the machine.
Reservoir level
As required
Restore the lubricant level in the reservoir.
Filling filter
As required
Check and possibly replace.
10. DISPOSAL
Do not dispose of polluting components in the environment during pump maintenance or in case of demolition; refer to
local regulations for correct disposal. Upon demolition of the pump, the identification label and any other document must
be destroyed.
ATTENTION
:
Before any maintenance or cleaning operation, make sure that hydraulic feed and electric
power are disconnected.