background image

© DreamLine

 All Rights Reserved

© DreamLine

 All Rights Reserved

14

ENIGMA AIR ENCLOSURE Shower Enclosure manual Ver 1 Rev 4 062019

©2019 DreamLine. All Rights Reserved

Fig 7

Fig 8

inside

7.

 

Outline the position of the 

Glass Bracket (#24)

 on 

the threshold.  

(Fig 7)

8.

 

Carefully slide the 

Return Panel Glass (#22)

 out of the 

U-Channel (#01)

 and set it aside. Remove 

the 

Glass Bracket (#24)

 from the 

Return Panel Glass (#22)

.  

(Fig 8 and Fig 9)

Summary of Contents for ENIGMA AIR SHEN-6434480 Series

Page 1: ...e refer to the model s web page on DreamLine com for the latest technical drawings installation manuals warranty information or additional product details MODEL s SHEN 6434480 SHEN 6434540 SHEN 643460...

Page 2: ...ts the buildup of soap and water spots Install the surface with the ClearMaxTM label towards the inside of the shower Please note that depending on the model the glass may be coated on either one or b...

Page 3: ...nclosure manual Ver 1 Rev 4 062019 2019 DreamLine All Rights Reserved Roller Wheel Adjustment Installation Steps Shower Enclosure Plan Dimensions Parts List B Parts List A Section title Page Detailed...

Page 4: ...nel installation is shown as an example throughout this manual For the left hand return panel installation simply begin on the opposite wall and reverse the orientation of the steps shown ENIGMA AIR E...

Page 5: ...ews Roller guard bolts Wheel bolts Glass Bracket bolts ENIGMA AIR troubleshooting and maintenance tips Roller wheels adjusted as needed so the bulb vinyl seal makes even contact with the wall from top...

Page 6: ...e wall Reinforcement for Enigma Series Heavy Glass frameless sliding shower or tub door Blocking height requirement to center as measured from threshold or tub deck Enigma Air Enigma Sky 73 for shower...

Page 7: ...l radius corners or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process...

Page 8: ...ns for future reference 6 ENIGMA AIR ENCLOSURE Shower Enclosure manual Ver 1 Rev 4 062019 2019 DreamLine All Rights Reserved Metal File Painter s Tape Silicone Tape Measure Screwdriver Phillips Drill...

Page 9: ...or Components 7 ENIGMA AIR ENCLOSURE Shower Enclosure manual Ver 1 Rev 4 062019 2019 DreamLine All Rights Reserved The glass surface with the ClearMax label must be installed facing the inside of the...

Page 10: ...s 7pcs Guide Rail Bracket 6a 6b Stopper 02 03 ST4 0 x 40 Pan Head Screw 01 U Channel 5 16 plastic wall anchor 1pc 07 11 12 13 09 10 08 14 17 18 19 15 16 21 20 Door glass for 48 54 or 60 Guide Rail for...

Page 11: ...reamLine All Rights Reserved The glass surface with the ClearMax label must be installed facing the inside of the shower 23 22 1 24 16 25 17 01 U Channel 1pc Parts List B 23 Stationary Glass Connector...

Page 12: ...434540 44 3 8 min to 48 3 8 max SHEN 6434480 measured from the finished wall to the outside surface of the return panel glass 34 3 4 34 3 4 2 1 4 minimum threshold required 2 1 4 minimum threshold req...

Page 13: ...on Fig 1 2 Measure the W2 dimension from the finished corner of the opening over to the return panel threshold based on the model size as shown on the Shower Enclosure Plan Page 11 Next measure the W1...

Page 14: ...U Channel 01 to the wall using the ST4 0 40 Pan Head Screws 17 Fig 4 3 Align the outside edge of the U Channel 01 with the inside of the mark from the previous step on the return panel side of the un...

Page 15: ...threshold 6a 6b 6 Place the Return Panel Glass 22 onto the threshold Slide the Return Panel Glass 22 into the U Channel 01 and level it vertically plumb Make sure the Return Panel Glass 22 is aligned...

Page 16: ...al Ver 1 Rev 4 062019 2019 DreamLine All Rights Reserved Fig 7 Fig 8 inside 7 Outline the position of the Glass Bracket 24 on the threshold Fig 7 8 Carefully slide the Return Panel Glass 22 out of the...

Page 17: ...arked position Fig 9 2 and then mark the hole for drilling on the threshold NOTE For installation into an Acrylic threshold drill an 1 8 3mm hole and use the ST4 0 x 25 Pan Head Screw 18 OR For instal...

Page 18: ...panel glass threshold W 12 Measure the distance from the finished wall to the inside surface of the installed Return Panel Glass 22 measure to the surface of the glass not to the surface of the insta...

Page 19: ...ed cut length Cut from the door end only Metal File Fig 14 Fig 13 U Channel outside inside threshold inside 13 Use a Chop Saw with a blade for cutting stainless steel to cut the Guide Rail 04 to fit t...

Page 20: ...nel and drill the holes in the wall using a 5 16 drill bit and insert the 5 16 Wall Anchors 16 into the holes Apply silicone into the screw holes and to the back surface of the U Channel Attach the U...

Page 21: ...the guide rail to level tighten to guide rail 72 1 4 The guide rail wall bracket should be centered in the bracket as shown to allow for vertical adjustment both up and down Note that the bottom of t...

Page 22: ...9 2 1 90 3 19 Insert the Stationary Glass 02 into the installed U Channel 01 Fig 19 20 Make sure the Stationary Glass 02 is parallel to the front edge of the threshold and mark a reference line onto t...

Page 23: ...nd remove the Guide block face plate Fig 22 1 Apply silicone to the underside of the Guide Block 12 and screw the Guide Block 12 to the threshold as described below NOTE For installation into an Acryl...

Page 24: ...holder hole Fig 24 23 Apply silicone into the U Channel 01 Slide the Stationary Glass 02 firmly into the installed U Channel 01 while carefully setting it into the groove of the Guide Block 12 Tighte...

Page 25: ...r to align the holes in the guide rail with the holes in the panel glass Tighten these set screws after the holes are aligned Fig 25 3 and 25 4 Fig 26 Fig 25 1 2 3 4 RETURN PANEL 26 Attach the Station...

Page 26: ...IGMA AIR ENCLOSURE Shower Enclosure manual Ver 1 Rev 4 062019 2019 DreamLine All Rights Reserved Fig 27 3 2 1 27 Level the Guide Rail 04 across the opening Use the set screws on the Guide Rail Bracket...

Page 27: ...ld 11 to the size of L Fig 28 29 Apply silicone to the bottom of the Anti Splash Threshold 11 Remove the face plate from the Guide Block 12 Insert one end of the Anti Splash Threshold 11 fully into th...

Page 28: ...e wheels facing out NOTE The roller adjustment disk can be rotated to tilt the door glass slightly to create a tight seal with the return panel glass Install both wheels the same and only make adjustm...

Page 29: ...en the interior post using the small allen wrench Fig 32 2 Fig 33 2 3 1 inside outside outside outside 33 Attach the Handle 15 to the Door Glass 03 Attach the Anti Water Strips 13 to the edge of the S...

Page 30: ...le for Left or Right wall installation Left wall installation shown below from inside the shower TIP Install the SafeStop Bumper 26 using the 3M tape Screwing the bumper to the wall using a 5 16 hole...

Page 31: ...llation Left wall installation shown below from inside the shower TIP Use caution if using the screw method to not crack the wall tile and to avoid any plumbing behind the wall Extender driver bit rec...

Page 32: ...Lock Adhesive 20 to the threads Reinsert the set screws into the Stoppers 05 Correctly position the Stoppers 05 and screw them tightly to the Guide Rail 04 with the supplied allen wrench NOTE The Sto...

Page 33: ...ed Fig 37 24 Hours Right hand return panel installation shown as an example Allow 24 hours for the silicone to fully cure before using the shower NOTE The surfaces need to be clean and free of debris...

Page 34: ...ge to the finish peeling or corrosion After cleaning the polished finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless ste...

Page 35: ...ights Reserved DreamLine All Rights Reserved TEL 866 731 2244 FAX 866 857 3638 DREAMLINE COM For more information on DreamLine Shower Doors and Enclosures please visit DreamLine com 2019 DreamLine All...

Reviews: