
14 Installation
(for qualified installers only)
Travis Industries
4101014
100-01257_000
Nailing Brackets
NOTE
: Additional nailing
brackets are provided along
the base of the fireplace.
Use these brackets if not
using the front brackets.
For installations using
5/8" (0.625mm) drywall
fold the shorter tab out
90° (use a screwdriver if
necessary).
For installations using
1/2" (13mm) facing fold
the larger tab out 90°
(use a screwdriver if
necessary).
Fireplace
Drywall
Framing
Nailing Bracket
TOP VIEW
1/2" (13mm)
Drywall
5/8" (0.625mm) Drywall
There are four nailing brackets
on the front of the fireplace.
Follow the directions below to
prepare the nailing brackets.
Once in place, nail or screw the
nailing brackets to the framing.
Fireplace
Drywall
Framing
Nailing Bracket
TOP VIEW
WARNING:
Make sure the fireplace is
square and plumb when
placed in the framing.
Measured corner-to-
corner, the fireplace
should be square (approx.
47-1/8" (1197mm) for each
dimension). Use shims to
insure the fireplace is
square.