
English
28
Supplement Zeus
Infinity Empowered
6
Establish the Luer-Lock connection (D) of the
sample line between the HME filter of the Y-
piece and the CO
2
water trap (E).
7
Connect the internal sample line (F) to the
Protect water trap (G).
Checking the operational readiness
Prerequisites:
– The device has been assembled and prepared
so that it is ready for operation.
Procedure:
Check the operational readiness, see
instructions for use, chapter "Getting started".
Connector for internal sample line to
the Protect water trap
Connector for sample line to the CO
2
water trap
157
F
G