
PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04
4 - 8
8. Install and turn, but do
not
tighten, the two #10-32 x
3/8" Nylok screws (K) in the upper holes on the inside
of the upper post (D).
9. Slowly lower the warmer (L) onto the upper post.
Align the slots (M) of the warmer under the two #10-
32 x 3/8" Nylok screws (K) in the upper holes on the
inside of the upper post.
10. Install the four #10-32 x 3/8" Nylok screws
(N)
to
secure the pivot bracket (O) to the head support plate
(C).
11. Tighten the two #10-32 x 3/8" Nylok screws (K)
installed in step 7 to secure the warmer to the upper
post.
12. Remove and
discard
the two #10-32 x 3/8" Nylok
screws (P) from the lower corners of the head support
plate.
13. Thread the power cable (Q) out through the opening in
the front of the upper post.
14. At the controller, connect the power cable (Q) to
connector J4 on the power and control P.C. board
assembly.
15. Mount the controller (B) on the upper post.
16. Reinstall the two #8-32 x ¾" screws (A) that secure the
controller to the head support plate (C).
17. Remove and
discard
the two #10-32 x 3/8" Nylok
screws (R).
K
D
L
M
N
N
O
C
P
P
J
M
Q
B
C
R
R
Summary of Contents for RW82
Page 2: ...This page intentionally left blank ...
Page 4: ...This page intentionally left blank ...
Page 16: ...PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04 1 8 This page intentionally left blank ...
Page 124: ...PROPRIETARY AND CONFIDENTIAL DRAFT 5 Feb 04 7 4 This page intentionally left blank ...