6-
INSTALLATION
Fundamental operations relating to lifting, transportation, installation, start-up,
maintenance and repair work must be carried out only by qualified personnel.
Disconnect the electrical power supply when carrying out any of the above.
2 fuses, for the pump and logic board, are also fitted on the logic board and can
also be replaced when needed only by qualified personnel.
The installation must be carried out by skilled personnel under the supervision of a qualified
person. All electrical connections must comply with the local requirements at the place of
installation. The machine must be earthed and protected against short circuits and
overloads.
In case of hard water (with high lime scale content = hardness in French degrees higher
than 25 ÷30, or 250 ÷ 300 ppm) it is necessary to employ an ion exchange water softener.
This unit must be calibrated so as to maintain a residual hardness ranging between 5 and
10 French degrees (50 ÷ 100 ppm). The use of electronic water softeners is not advised,
since their efficacy has not been proved yet.
Fix the doser-mixer to the wall at 1350 ÷ 1550 mm height from the floor, using the two wall
plugs supplied. The 90° wall plug hook is supplied to provide support for the water delivery
outlet elbow.
Do not place other machines below the device.
Arrange the water inlet tubings, mounting the ball taps (1) at their ends.
Provide to insulate thermically the inlet pipes to obtain the best performances.
It is recommended to perform links as short as possible from the chiller / boiler to the
DOMIX, avoiding going through the pipes near sources of heat such as the ovens.
Perform a purge of all pipes to eliminate waste processing, which could damage the
equipment.
Connect the doser to the ball taps using connectors (2).
Connect the delivery tube (10) to the machine.