PIR Sensor Installation
Step 1:
Please refer to the "Quick Setup Guide" section.
Step 2:
The best location for the PIR is in the corner of the room that will allow the
PIR to monitor the maximum area.
Do not install PIR facing heating objects or windows. This can trigger a false
alarm.
Minimum height for PIR installation is 1.5 metres and maximum height is 2.2
metres.
DO NOT INSTALL
PIR FACING THE WINDOW
RECOMMENDED LOCATION
FIRE
HOT WINDOW
HEATER
Min. 1.5 m
16
Step 3:
Install the bracket to the wall or ceiling with the 2 screws provided.
Note:
It is recommended that you install the PIR on the ceiling for
maximum coverage.
Step 4:
Set the angle of the PIR to cover the desired area. It is recommended
to set the angle between 4 ~ 8 degrees. Do not set the angle to more
than 8 ~ 9 degrees. Please perform the
PIR Walk Test
to ensure that
you have the correct angle to achieve the coverage area that you require.
Step 5:
Perform a walk test to determine the actual coverage area. This is determined
by the first flash of the LED on the PIR which can vary slightly.
PIR sensor coverage area is approximately 80 degrees.
CEILI NG MOUNT
WAL L MOUNT
17
Max. 2.2 m
o
4 ~8
o