10. Pull housing (6) and basic housing (3)
together.
11. Insert and tighten three screws (1).
12. Tighten nut (2).
9.3.10 Replace electrode
Personnel:
Operator
+ additional qualification high tension
technology
+ additional qualification explosion pro-
tection
Protective equipment:
Protective workwear
Anti-Static Safety Boots
Requirements:
Disassembly
Fig. 48: Disassemble electrode
1. Rotate electrode (1) by hand by 90° and
pull it off.
Fig. 49: Replace O-ring
2. Replace O-ring (2).
Assembly
3. Insert electrode (1) by hand up to the
stop. Turn into spraying direction, until a
clicking sound is heard.
10
Disassembly and Disposal
10.1 Safety recommendations
DANGER!
High voltage
High voltage can be present on compo-
nents and cables. There is a risk of death
due to electric shocks and discharges.
Before carrying out any work:
– Switch off electrostatic controller.
– Discharge electrode by means of a
grounding rod. In this, pull the trigger
completely.
– Verify no current is present.
Disassembly and Disposal
11/2019
EcoGun AS MAN EC - MSG00022EN
35/52