background image

First entry last exit 

procedure (if fitted)

The purpose of this system is to allow an opening of the 
door when the Program Switch is in the OFF position 
and the sensors are not operable.

This means that people should not open or close the 
door MANUALLY which could result  in a major failure of 
the operator and potentially damage components.

There will be a GREEN BUTTON near to the door on the 
inside of the building.

To EXIT the building:

1.  Turn the program switch to the OFF position and let 
  the door close (stand away from the door to ensure 
  the sensor does not detect you).
2.   Set the building alarm (if you have one)
3.   Operate the GREEN BUTTON to open the door
4.   Exit and allow the door to close (stand away from 
  the door to ensure the sensor does not detect you), 
 

then lock the door in the centre with the key when 

 closed.

To ENTER the building:

There will be a KEY SWITCH or other access control 
near to the door on the outside of the building

1.   Unlock the door, before using the KEY SWITCH
2.   Operate the key switch on the outside of the 
 

building, this will open the door

3.   Enter the building (stand away from the door to 
  ensure the sensor does not detect you), the door will 
  then close behind you
4.   Turn off the building alarm (if you have one)
5.   Put the program switch into the required position, 
  or leave it in the OFF position
6.   If required to admit staff members before opening 
  hours, simply press the GREEN BUTTON. The door 
  will open then re-close.

AUTOMATIC FOLDING DOOR LOG BOOK

8

2021-10

Summary of Contents for FFT FLEX Green

Page 1: ...Important warranty user information and service record for your automatic door Automatic folding door operating maintenance manual For power operated doors to EN 16005 ...

Page 2: ...akdowns and the accompanying inconvenience and prolongs the life of the door operator There are also legal implications regarding the servicing of all door types which must be adhered to to ensure the safety of users at all times All safety requirements for power operated doors are stipulated in EN 16005 2012 Power operated pedestrian doorsets Safety in use All dormakaba service engineers are trai...

Page 3: ...transfer any additional obligation to dormakaba regarding this product dormakaba standard terms and conditions will apply at all times and are available on request dormakaba are not liable for the consequences of any third party claim on its products which are sold in the knowledge that installation is carried out by competent staff and maintained in accordance with current safety standards Thank ...

Page 4: ...lex Green Other please state below delete as applicable Sales Order No Asset No Year of construction Commission date Installed by DORMA UK Ltd Other please state company Doorset location reference Additional information In order that an automatic door operator may comply with the requirements of EN16005 2012 a risk assessment should be carried out prior to installation which assesses the risk to u...

Page 5: ...n All documentation complete 3 2 Check safety equipment according to risk assessment to EN 16005 Finger protection crushing shearing and drawing in Safety sensors Sensor monitoring Reversing Stop equipment Safety screen Safety contact strips SCS Force limitation Emergency pushbuttons Safety sensors Fire alarm connection Batteries 3 3 Control elements Pushbuttons switches Contact mats Radio control...

Page 6: ... the door is electro mechanically locked Door may be opened using first entry last exit switches if fitted If a person or object comes within range of the radar detectors the door opens to full opening width and closes at the end of the preset hold open time The external sensor is deactivated the door may only be used from the inside e g one way function on close of business If a person or object ...

Page 7: ...m switch to PARTIAL OPENING The door stops and the control unit stores the desired position The door commences a closing cycle The door opens in check speed to its full opening width and remains in the position until another function is selected In the event of power failure If the program switch is in the AUTOMATIC position the door will fail open If the program switch is in the OFF position the ...

Page 8: ... to open the door 4 Exit and allow the door to close stand away from the door to ensure the sensor does not detect you then lock the door in the centre with the key when closed To ENTER the building There will be a KEY SWITCH or other access control near to the door on the outside of the building 1 Unlock the door before using the KEY SWITCH 2 Operate the key switch on the outside of the building ...

Page 9: ...d area after a short time delay the door should close General Observations Check there are no hazards due to crushing shearing impact and drawing in Check that the opening and closing speed are not likely to increase the risk of impact Check that finger guards are secure and in good condition Check the door area does not present tripping or slipping hazards Check all door panels for broken cracked...

Page 10: ...d belt and retension replace as required 3 Check escape route function of escape route systems check rubber cord and retension replace as required 4 Check door suspension and adjust repair replace as required 5 Check floor guide and adjust repair replace as required 6 Check all fixing components and retension as required 7 Check all settings and readjust as required 8 Check all safety equipment an...

Page 11: ...rrival at site If it is not available then it is the responsibility of the facilities operator to record the visit AUTOMATIC FOLDING DOOR LOG BOOK 11 2021 10 Visit date Work Order Asset number Service information Work carried out Test report defects if any and required action Name Company name of qualified technician Signature ...

Page 12: ...TIC FOLDING DOOR LOG BOOK 12 2021 10 Visit date Work Order Asset number Service information Work carried out Test report defects if any and required action Name Company name of qualified technician Signature ...

Page 13: ...TIC FOLDING DOOR LOG BOOK 13 2021 10 Visit date Work Order Asset number Service information Work carried out Test report defects if any and required action Name Company name of qualified technician Signature ...

Page 14: ...TIC FOLDING DOOR LOG BOOK 14 2021 10 Visit date Work Order Asset number Service information Work carried out Test report defects if any and required action Name Company name of qualified technician Signature ...

Page 15: ...TIC FOLDING DOOR LOG BOOK 15 2021 10 Visit date Work Order Asset number Service information Work carried out Test report defects if any and required action Name Company name of qualified technician Signature ...

Page 16: ...tate Falkirk FK2 9HQ IRELAND PO Box 1050 Maynooth Co Kildare NORTH WEST Unit 10 Meadow Business Park Meadow Lane Bolton BL2 6PT dormakaba Kaba Ltd Lower Moor Way Tiverton Devon EX16 6SS LONDON NORTH SOUTH Wilbury Way Hitchin Hertfordshire SG4 0AB MIDLANDS NORTH EAST SOUTH WEST Lower Moor Way Tiverton Devon EX16 6SS Unit 32 Crowther Road Crowther Industrial Estate Washington Tyne Wear NE38 0AD The ...

Reviews: