Place tab in cover slot opposite main arm.
Place cover over closer and fasten securely with
screws provided.
TAB
NOTE: LEFT HAND INSTALLATION SHOWN. RIGHT
HAND IS A MIRROR IMAGE.
QTY
(2)
IMPORTANT: THE UNIT MUST BE TESTED AFTER THE
INSTALLATION, BY THE END USER, TO ASSURE
THAT THE DOOR CLOSER UNITS FUNCTION PROPERLY
WHEN THE ALARM SYSTEM IS ACTIVATED. THE ENTIRE
SYSTEM MUST ALSO BE TESTED PERIODICALLY AFTER
THE INITIAL INSTALLATION TEST, IN CONJUNCTION WITH
THE TESTING OF THE FIRE ALARM SYSTEM. THE END
USER IS ALSO RESPONSIBLE FOR THE ADJUSTMENTS
AND MAINTENANCE TO RETAIN THE SYSTEM IN
WORKING ORDER.
SD-2 DETECTOR MAINTENANCE
The SD-2 Detector has been designed to be as
maintenance-free as possible. Normal air-borne
dust, however, can accumulate in the detector
sensing chamber and cause it to become more
sensitive. All detectors must be tested and cleaned
at least once a year. Detectors in dusty environ-
ments must be tested and cleaned more often.
Detectors must also be tested and cleaned imme-
diately after a fire. Failure to maintain detectors
may result in needless false alarms.
21
20
3
An auxiliary door stop (by others) must be
installed to limit the maximum degree of door
swing. Failure to do so may result in damage
to the unit.
19
1
SNAP VALVE ADJUSTMENT
WRENCH INSIDE COVER
RP1 & RP2. This voltage is a small signal, DC
voltage. Set meter to the 2 volt scale.
RP2
RP1
Measure and record test voltage at test points
2
the first time.
straight up. Cover may be difficult to remove
screwdriver in slot (both sides) and pulling it
First, vacuum or blow off any loose debris on
cover and screen assembly by rotating a flat
outside of cover. Then, remove the detector
CHAMBER
FINS
reassembling the detector, be sure all parts are
COVER
free of debris.
UNDER
COVER
SCREEN
PHOTO
off same areas with compressed air. Before
Vacuum all areas illustrated below, and then blow
INS NO.
PAGE
Rev.
08280990
13 of 14
08/13