![Donati DRH 1 Series Instructions For Use Manual Download Page 83](http://html1.mh-extra.com/html/donati/drh-1-series/drh-1-series_instructions-for-use-manual_2520699083.webp)
MAN16MG05
instructions
for
use
series
drh
1/2/3/4 -
dst
/
n
/
s
-
dst
/
r
-
drt
82
•
NEVEr
use the lifting rope as slinging for the load (fig. 128).
•
NEVEr
lift loads with the point of the hook.
•
NEVEr
perform a hook run, after having positioned the load, in a way which causes the rope to wobble.
•
NEVEr
employ two simultaneous movements when using the hoist or the trolley, wait until one movement has
come to a complete stop before beginning another (fig. 129).
•
NEVEr
leave the hoist exposed to atmospherics agents (rain, wind, snow, etc.) when work has been terminated.
•
NEVEr
use the automatic limit switches continuously.
•
NEVEr
employ the hoist when there is a large drop in the voltage or when one of the phases is lacking.
•
NEVEr
perform sudden changes of direction during handling operations.
•
NEVEr
press the control buttons on the push-button panel repeatedly.
•
NEVEr
modify the functions or the characteristics of the hoist and/or its components.
•
NEVEr
carry out temporary repairs or procedures for putting the machine back into operation which do not
comply with the instructions.
•
NEVEr
employ the hoist in areas where the use of flameproof component is required.
•
NEVEr
tamper with the settings of the safety devices (limit switches and overload device).
•
NEVEr
use non-original spare parts or spare parts which have not been recommended by the manufacturer.
•
NEVEr
assign exceptional maintenance or repair work to staff not trained by the manufacturer.
• ˆ
NEVEr
leave the hoist at the end of a job without having lifted the hook block and relative hook to a height no
lower than 2.5 m (fig. 130).
•
NEVEr
, during maintenance work: (fig. 131)
.
• lean ladders on the hoist or trolley.
• carry out work without having removed the load.
fig. 128
fig. 129
fig. 130
fig. 131
2,5 m
minimo
83
instructions
for
use
series
drh
1/2/3/4 -
dst
/
n
/
s
-
dst
/
r
-
drt
MAN16MG05
6.1
The precautions to prevent accidents contained in this paragraph must always be strictly adhered to during
maintenance work, with the aim of avoiding damage to staff and to the hoist.
Such precautions are covered in greater detail in this chapter, whenever a procedure which may carry a risk of
damage or accident is required, through
WARNING
and
dANGEr
notes:
Safety precautions
6. - MAINTENANCE OF THE HOIST
WARNING notes precede an operation which, if not correctly carried out, may cause damage to the
hoist and to the relative trolley.
DANGER notes precede an operation which, if not correctly carried out, may cause injury to the
operator
Based on the requirements of
ISO 9927-1:1994
, maintenance of electric wire rope hoist series DRH and related
trolleys, must be entrusted to maintainers of proven experience that, for the their basic training, have adequate
knowledge in the field of lifting equipment and are sufficiently familiar with the rules for determining the
deviations from the conditions of operation of electric hoists and their components.
6.2
The qualifications of maintenance staff
II maintenance personnel must also:
• know the laws in force related to accident prevention during work carried out on
machines with motor transmissions and be able to apply them
• have read and understood chapter 3 “Safety and Accident Prevention”
• recognise irregularities regarding functioning and when necessary take necessary
measures to rectify them.
1. If performed correctly maintenance work guarantees the safety of hoist operators and reduces downtime to
a minimum after a breakdown.
2. Repairs carried out opportunely prevent further deterioration of the hoist.
3. When possible always use original spare parts and products.
Special recommendations regarding maintenance:
For problems which may come about or to order spare parts contact the DONATI SOLLEVAMENTI S.r.l.
Technical Assistance Service.
Maintenance work must be carried out, when possible, while the hoist is not connected to the power
supply and in safe conditions, using suitable tools and adequate personal protection devices, in
accordance with the regulations in force, and affixing a sign with the warning: “MAINTENANCE
WORK IN PROGRESS”.
KMAN16MG05
Summary of Contents for DRH 1 Series
Page 128: ...KMAN16MG05...
Page 129: ......