7
Donaldson Company, Inc.
angle not to
exceed 30°
from vertical
(min 60°
from horizontal)
M10-1.5 x 25mm bolt
M10 flat washer
M10 flat washer
M10-1.5 hex nut
sealant
module flange
hopper flange
Do Not lift with
this orientation
X
Take center of gravity into
consideration when lifting unit.
Do not install blower before lifting unit.
1. Place hopper discharge-side up on ground or other
level surface and attach legs to hopper.
2. Assemble leg cross braces.
3. Turn hopper and leg assembly over and lift into
position over anchor bolts.
4. Level hopper.
5. Tighten all fasteners securely, including all anchor
bolts.
Tighten all hardware
before removing crane.
6. Apply rope sealant to upper hopper flange
(hopper/cabinet seam) so sealant is positioned on
the inner edge of the bolt holes (see instructions
shipped with collector).
7. Lift unit over leg and hopper assembly and lower
slowly.
8. Secure with bolts, washers, and nuts supplied.
Tighten all hardware
before removing crane.
9. Remove crane.
Steps 1-2
Steps 3-6
Steps 7-9
Apply sealant after
marriage of hopper
to cabinet and
cabinet to inlet
(steps 7-9)
VH Typical Installation
VH Typical Installation
Summary of Contents for PowerCore VH 1-4
Page 43: ......