![Donaldson Torit Downflo DWST 4-1 Installation And Operation Manual Download Page 22](http://html1.mh-extra.com/html/donaldson-torit/downflo-dwst-4-1/downflo-dwst-4-1_installation-and-operation-manual_2520660022.webp)
A5
Donaldson Company, Inc.
DWST 4-2 to 4-4 and 6-2 to 6-4 Multiple Power Module Installation
1. Connect lifting sling or chains to the four lifting eyes located on the roof of the power module.
2. Position the modules side by side. Position the first power module, remove the lifting eyes before positioning the next power
module, as the lifting slings and chains can interfere.
3. Secure the power modules together using the joining strips, bolt hole plug pack, M8 x 20 mm bolts, and flat washers.
4. Lifting eyes can be removed once collector is in place to install more power modules and for mounting accessories on roof.
DWST 4-2 to 4-4 and 6-2 to 6-4 Multiple Power Module Installation
lifting eyes
inlet
joining strips
plug holes both outside edges