17
EN
SmartStart RV Soft Start Accessory Installation
7 .2 Installing the Device in a
Penguin II AC Unit
This section describes how to access the installation
area, disconnect the existing wiring, mount the device,
install and connect the new wiring, and close the unit
after completing the installation in a Penguin II AC unit.
7 .2 .1 Removing the Covers
q
q
w
w
e
e
e
e
r
r
27
Removing the Gasket Foam
q
AC Shroud
r
White Insulating
Foam
w
AC Shroud Screws
e
Gasket Foam Cut
Points
1. Using the #2 Phillips screwdriver, remove the four AC
shroud screws and the AC shroud.
I
Turn the AC shroud upside down to store the
screws and other small parts removed during
the installation process.
2. Using the utility knife, cut through the gasket foam on
either side of the control box, to avoid tearing later.
q
q
w
w
e
e
r
r
28
Disconnecting the Blue Wire from the Relay Block
q
Electrical Box Cover
Screws
e
Relay Block
r
Blue Compressor
Wire
w
Electrical Box Cover
3. Using the 5/16 in. deep well nut driver, locate and
remove the two screws from the front of the electrical
box.
4. Using the needle nose pliers, remove the blue wire
from the relay block inside the electrical box.