12
EN
Installation
Parking Cooler
1. From the inside of the cab, position the mounting
brackets so they are within the roof opening and are
spaced 16 in. (406 mm) apart.
q
w
e
r
t
16
Securing the Mounting Bracket
q
Mounting Bracket
r
8.5 x 20 Lock
Washer
w
M8 x 100 Screw
e
M8 Washer
t
M8 Nut
2. Insert the four M8 x 100 screws, M8 washers, and
8.5 x 20 lock washers into the mounting brackets.
3. Screw the four M8 nuts onto the four M8 x 100 screws
protruding from the top of the mounting brackets.
4. Torque the four M8 x 100 screws to 44 in. lbs (5 N·m).
7 .3 Routing the Wiring
1. Connect the unit directly to the main power
distribution box.
I
Ask your vehicle manufacturer for the specifications
of the main power distribution box.
q
w
y
e
t
r
17
Routing the Power Supply Lead
q
Unit
r
Blade Fuse 2 A
w
Power Supply
t
Joint Connector
e
Maxi Fuse 80 A
y
2 in. Wiring Grommet
2. Use a hole saw to drill a 2 in. (51 mm) hole in the floor
of the vehicle.
3. Install a 2 in. (51 mm) grommet into the hole that was
drilled in the floor of the vehicle.
4. Route the cables through the lining of the vehicle to
the floor of the vehicle (Fig. 17).
5. Connect the red positive lead for the power supply
via an 80 A fuse.
6. Connect the red positive lead for the voltage signal
via a 2 A fuse.