PPC-1000 Rev.1.0
12 of 29
User
Manual
© DOK Ltd (Mm-wave Division of ELVA-1 ltd), 2005-2006. All rights reserved.
4.4
Alignment Tools
The following tools should be on hand when running the alignment of the radio system:
•
Wrench 8 mm & 17 mm (item 17)
•
Hose clip, 50-70 mm (item 8)
4.5
Equipment assembling
Both radios equipped with 6
1
long shipping bolts (see
photos from part 4.2 Equipment Unpacking).
Replace the shipping bolt placed near the “Ground” mark
with a set #15, observing the items order. The Radio
flanges should be placed between contact strips.
Connect the grounding wire to the bolt as shown on the
photo.
Replace the rest 5 shipping bolts with bolts, nuts,
washers and tightening washers (set #14).
1
The exact number of the bolts used for shipping purpose may differ.