PPC-1000 Rev.1.0
10 of 29
User
Manual
© DOK Ltd (Mm-wave Division of ELVA-1 ltd), 2005-2006. All rights reserved.
4
Installation
4.1
General
It is recommended that installation personnel read this section in its entirety prior to installing
the System. During a particular phase of installation, the user may refer directly to the
applicable subsection.
4.2
Equipment Unpacking
The radio system equipment will arrive in two to four wooden boxes depending on antenna
diameter. For small antennas it’s usually 2 boxes in the shipping —one box for the low band
radio and one box for the high band radio. It is recommended that the shipping boxes and
packing materials be retained in the event that it is necessary to return equipment.
Open the top cover of the box, and take out the antenna first (for small antennas link only).
Large antennas come in separate boxes and have to be unpacked accordingly.
The radio case with alignment mechanics and cable pack is fastened to a wooden plate within
the shipping box to prevent damage during transportation. When unpacking the radio,
remove metallic straps, and then take the radio out of the box, lifting the right side first (see
photos below).
Unscrew the shipping bolts and detach the wooden plate to fully unpack the radio case.
The paper boxes with accessories are fastened to a bottom of the shipping box. Remove their
shipping straps and take out the boxes with accessories.