Oil Maintenance Schedule

Drain, flush, and refill with oil after 2 to 3 weeks of initial break-
in operation. Since the satisfactory operation of the bearing 
depends entirely on an oil film being maintained between the 
shaft and the bearing liner surface, it is recommended that an oil 
analysis be performed at these regular intervals.
• 

Every 3 months for 24 hour/day service

• 

Every 6 months for 8 hour/day service

Acceptably of oil should be referred to the lubricant manufacturer. 
If oil quality is acceptable then repeat this procedure in 3 month 
intervals. Visually check oil for contamination between oil analysis 
checks. Oil service life depends upon several factors such as 
ambient conditions, operating temperature and frequency of 
bearing starts and stops. It is recommended that the oil be 
changed at least once per year for unfiltered static applications. 
Removing contaminants through the use of either the OLF 2 
(Oil Level and Filtration 2) Unit or a circulating oil system can 
extend oil service life. Consult equipment manufacturer for more 
information.

Any questions about installation, maintenance, and arrangement 
of coolant or oil connections should be referred to the equipment 
manufacturer.

NOTE: Isolators or Auxiliary Seals are recommended for 

outdoor applications, contaminated atmospheres, and high 

volume air flowing over the bearing.

Temperature

The bearing temperature will increase after start-up until its 
normal operating point is reached. The normal operating 
temperature should not exceed 180

°

F. Make sure to check 

with the OEM for the specified normal operating temperature. 
An alarm temperature should be set at 15

°

F above the normal 

operating temperature. A shut-down temperature should be 
set at 30

°

F above the normal operating temperature. Some 

fluctuation due to ambient temperature change is normal.

Low ambient and operating temperatures can be as harmful to 
the bearing as high temperatures. The Dodge heater / thermostat 
combo can be used in these low ambient conditions.

The Dodge heater / thermostat combo turns on at 70

°

F and 

turn off at 100

°

F to ensure proper oil sump temperature during 

operation.

NOTE: The recommended oil temperature at start-up is 70°F 

MINIMUM.

CAUTION: If heaters are used, be sure heaters are off when 

oil is removed from bearing.

WARNING: When installing heater and thermoswitch, follow 

directions and safety procedures recommended by the 

manufacturer.  Install wiring in accordance with the National 

Electrical Code and local codes.  Failure to observe these 

guidelines could result in electrical shock. 

Vibration

Any significant vibration or imbalance MUST be corrected. 
Check with equipment manufacturer for acceptable conditions.

Pillow Block Material Details

Housing:

Class 30 Gray Cast Iron

Liner:

Class 30 Gray Cast Iron

Babbitt:

Lead or Tin Based Babbitt

Oil Rings:

Bronze

Aluminum Seal:

Sand Cast Aluminum

O-ring:

Elastomer Compound

Aux. Seal:

HNBR with Stainless Steel Retainer

Grommet:

Synthetic Rubber

Grommet Plate:

Carbon Steel

Pipe Nipple:

Carbon Steel

Oil Gauge: 

Stainless Steel, Polypropylene

Hardware:

Carbon Steel

Plunger Screw:

Carbon Steel

Gasket Eliminator:

LOCTITE 515 Sealant

This Sleevoil pillow block could contain lead in the bearing 
Babbitt material, please exercise proper precautions in the use, 
installation, dismantling and recycling of this unit.

Other Notes:

CAUTION: This product is not to be used for person moving 

applications.

NOTE: Care has been taken to keep instruction manuals 

accurate and timely. The most recent version of the 

instruction manual can be found on our website: 

www.dodgeindustrial.com

Weights:

Table 7 - Weight of RTL Sleevoil

RTL SLEEVOIL 

Size

Approximate Weights (lbs.)

Non-Expansion 

Pillow Block

Expansion 

Pillow Block

Liner Assembly

3-7/16

195

190

47

3-15/16

238

230

65

4-7/16

311

300

82

4-15/16

441

425

113

5-7/16

521

500

144

6

854

825

182

7

1018

978

257

8

1368

1310

412

9

1738

1650

623

10

2262

2150

955

12

3670

3500

1405

  

 

Summary of Contents for SLEEVOIL RTL 10

Page 1: ...y qualified personnel who are familiar with the construction and operation of all equipment in the system and the potential hazards involved When risk to persons or property may be involved a holding...

Page 2: ...les in the liner are aligned with the two thermocouple RTD holes in the housing Apply oil to the liner bearing surface NOTE Liner has been machined to close tolerances Scraping of bore is not necessar...

Page 3: ...ty of the liner base INSTALLATION OF OIL RINGS NOTE Do NOT use oil rings if liner cap has baffles installed in the oil ring grooves Oil rings are shipped disassembled with two extra screws Place oil r...

Page 4: ...NG If it ever becomes necessary to remove liner cap make certain that both upper thrust plate halves remain in place next to the thrust collar If a plate half should remain in the liner cap it can dro...

Page 5: ...l other half of seal and tighten screws to torque given in Table 3 Check to make sure the seal will slide along the shaft with minimum effort to allow for shaft expansion Align the seal in the middle...

Page 6: ...position of the plunger screw Loosen plunger screw one turn and loosen shaft hold down Next tighten plunger screw to the mark Remove shaft hold down and tighten plunger screw locknut NOTE Do NOT tigh...

Page 7: ...e the probe tips contact the end of the drilled holes in the liner Use sealant on all threaded connections Check construction drawings to determine if coolant water or air is to be supplied to the bea...

Page 8: ...cosity is determined by the equipment manufacturer and normally specified on the construction drawing Information regarding qualities and properties of specific oils should be referred to the lubrican...

Page 9: ...temperatures can be as harmful to the bearing as high temperatures The Dodge heater thermostat combo can be used in these low ambient conditions The Dodge heater thermostat combo turns on at 70 F and...

Page 10: ...135290 135291 135292 135293 135294 135295 135296 135297 135298 135299 135135 36 38 RTL Seal Kit Clamp Seal Assembly O Ring 2 2 2 435001 435002 435003 435004 435005 435006 435007 435008 435009 435010...

Page 11: ...ld cuttable stainless steel probe a platinum sensing element and a spring loaded fitting with an oil seal COOL LUBE 2 All the features of the OLF 2 system plus a built in heat exchanger for continuous...

Page 12: ...Dodge Industrial Inc 1061 Holland Road Simpsonville SC 29681 1 864 297 4800 All Rights Reserved Printed in USA MN3060 02 22 3060 0222 DODGE INDUSTRIAL INC AN RBC BEARINGS COMPANY...

Reviews: