LOAD LEVELING SYSTEM — IF EQUIPPED
The automatic load leveling system will provide a level-
riding vehicle under most passenger and cargo loading
conditions.
A hydraulic pump contained within the shock absorbers
raises the rear of the vehicle to the correct height. It takes
approximately 1 mile (1.6 km) of driving for the leveling
to complete depending on road surface conditions.
If the leveled vehicle is not moved for approximately 15
hours, the leveling system will bleed itself down. The
vehicle must be driven to reset the system.
3
UNDERSTANDING THE FEATURES OF YOUR VEHICLE
255
Summary of Contents for Charger 2016
Page 4: ......
Page 7: ...1 INTRODUCTION 5...
Page 10: ......
Page 258: ......
Page 266: ...INSTRUMENT CLUSTER PREMIUM Instrument Cluster For 6 4L 264 UNDERSTANDING YOUR INSTRUMENT PANEL...
Page 470: ...468 STARTING AND OPERATING...
Page 520: ......
Page 625: ...MAINTENANCE SCHEDULES CONTENTS MAINTENANCE SCHEDULE 624 Maintenance Chart 626 8...
Page 632: ......
Page 644: ......
Page 645: ...INDEX 10...