2. MACHINE LOADING AND UNLOADING
The machine loading and unloading operation can be carried out by:
lift truck;
hoisting crane.
* Make sure the carrying sling or chain used to lift is sufficient to lift the weight of
the pump *
WARNING:
in either case the machine must not be lifted by the weakest par ts of
the structure (delivery pipes, etc...).
WARNING
: befor e lifting the str uctur e, be sur e that it is well-balanced.
fig. 4
fig. 2
fig. 3
SUPER PUMPS
:
PTO DRIVEN
ME PUMPS:
ELECTRIC DRIVEN