Step 2B: Running the Continuity Test (Recommended)
1-20
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
Step 2B: Running the Continuity Test (Recommended)
Figure 1.15 shows the initial
Continuity Test
window.
N
OTE
The Continuity Test must be run with the circuit breaker in the closed
position.
If the Continuity Test fails, check all test connections starting with the
connections to the circuit breaker, then the connections to the TDR9000
Physical Front Panel.
For instructions on performing this test, refer to ”Running the Continuity
Test” on page 4-71.
Figure 1.15 Continuity Test
Summary of Contents for TDR9000
Page 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...