
TDR9000
™
Circuit Breaker Test System User’s Guide
72A-1898 Rev. A 11/01
A-25
Monday
, November 26, 2001 1:09 pm
Figure A.26 shows what happens when the diagram is simplified and
analyzed at the moment when contact #2 closes and contact #1 is still
open.
Figure A.26 Capacitance-to-Ground:
Contact #2 Closed, Contact #1 Open
When contact #2 closes, the potential at point A goes from +V
s
to zero.
Consequently, to simplify the analysis, replace the closing of contact #2
with a voltage source, which represents a step-down function.
Excluding the Instrument power supply (S) from the circuit, since it has
no effect on the transient process, and redrawing the diagram, it appears
as shown in Figure A.27.
Figure A.27 Capacitance-to-Ground:
Contact #2 Closed, Contact #1 Open (Simplified)
R
6
1
R
6
2
A
B
C
1
C
3
C
C
2
Contact #1
Contact #2
A
C
3
C
1
B
R
g
1
R
g
2
C
2
C
Summary of Contents for TDR9000
Page 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Page 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...