5.7
Perform a Test
5.7.1 Pre-test Check List
Before conducting any test, review and check off this list:
•
Has the circuit breaker under test been removed from service according to
government and company safety rules?
•
Has the external ground cable (safety ground or chassis ground) been installed on
the TDR900 and connected to the breaker ground?
•
Is proper AC power available for the TDR900?
•
Has one end of each phase of the breaker been grounded?
•
Have all DC power knife switches been opened in the Breaker Control cabinet?
•
Was the breaker in the closed position when the motion Transducer Connecting
Rod was installed?
•
Has the Transducer Cable been connected to the secured Motion Transducer?
•
Have the Contact Monitor Cables (Sectional or Overall) been connected to the
breaker bushings?
•
Are all Control cables connected to the TDR900?
If all steps are checked OK, reapply DC power to the breaker for off-line tests to go
ahead.
Summary of Contents for TDR900
Page 4: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 iv This page intentionally left blank ...
Page 6: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 vi This page intentionally left blank ...
Page 16: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 4 Figure 2 TDR900 Instrument Front View ...
Page 30: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 18 This page intentionally left blank ...
Page 38: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 26 This page intentionally left blank ...
Page 76: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 64 This page intentionally left blank ...