Connect the Common (black color-coded) lead to the bushings which have been
grounded; connect the three-phase leads (color-coded red, yellow and blue) to the three
ungrounded breaker bushings (one to each).
Figure 12. Contact Monitor Cable for Overall Test
5.5.2 Sectional Test (live Tank or EHV test)
One cable is required for each pair of contacts for the sectional test on each phase. The
common lead should attach to the center of the breaker section, with the contacts attached
to the bushing terminals, as shown in Figure 13. Two further cables will be needed for the
other two phases.
TDR900 & PC
Summary of Contents for TDR900
Page 4: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 iv This page intentionally left blank ...
Page 6: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 vi This page intentionally left blank ...
Page 16: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 4 Figure 2 TDR900 Instrument Front View ...
Page 30: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 18 This page intentionally left blank ...
Page 38: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 26 This page intentionally left blank ...
Page 76: ...Doble TDR900 User Guide 72A 2612 01 Rev A 09 06 64 This page intentionally left blank ...