12
4C-3 Quartz Tube Installation
1. Place a sealing O-ring approximately 1/2in (12.7mm) from the end of the quartz tube. Insert quartz tube into the UV
reactor until it is fully seated in the bottom of the UV reactor.
NOTE:
If the end of the quartz tube is protruding from the UV reactor, the alignment is off. Remove and re-insert the
quartz tube to seat it properly as shown in
Figure 7
.
2. Place the lamp retainer over the quartz tube and attach the lamp retainer using the lamp retainer screws and
washers as shown in
Figure 6
. Make sure the lamp retainer flanges are fully seated against the UV reactor.
3. Tighten main inlet and outlet fittings on the AOP Pro.
4. Turn the circulation pump ON and check the quartz tube seals for leaks.
5. Turn the circulation pump OFF once you have confirmed that the quartz tubes are not leaking.
Properly Seated Quartz Tube
Improperly Seated Quartz Tube
Figure 7: UV Quartz Tube lnstallation
4C-4 Re-installing the UV Lamp(s)
NOTE:
Make sure to handle the UV lamp as described in
SECTION 4B-1
.
1. TURN OFF YOUR PUMP IF YOU HAVE NOT DONE SO.
2. Slowly press the UV lamp fully past the lamp retainer tabs and into the quartz tube until it is seated on the lamp
cushion in the bottom of the quartz tube.
3. Connect the UV lamp connector to the connector on the ballast.
ENVIRONMENTAL NOTICE:
Hg-Lamp CONTAINS MERCURY. Manage in accordance with disposal laws. See: www.
lamprecycle.org
4. MAINTENANCE & SERVICE