Systems and Equipment - 68
XT855 Operator’s Manual
Excavator Control Pattern
Excavator Control Pattern
Change Pattern
The XT855 is built to operate according SAE specifications, but can be modified to operate according to
ISO specifications.
1.
Disengage excavator stow lock.
2.
Fully extend boom and rest bucket on the ground.
3.
Change hose positions as shown below. Be careful not to cross hoses near the ends.
4.
Verify controls work properly. See “Operate Controls” on page 69 for ISO pattern operation and
“Joysticks” on page 28 for SAE pattern operation.
IMPORTANT:
Numbers are scribed into hose connectors. These hose numbers are referenced in the
instructions below.
Ref.
Description
Ref.
Description
1
boom cylinder, rod
4
dipper cylinder, barrel
2
dipper cylinder, rod
5
bucket cylinder, rod
3
boom cylinder, barrel
6
bucket cylinder, barrel
SAE
ISO
Summary of Contents for XT855
Page 1: ...XT855 Operator s Manual 053 1985 Issue 1 0 CMW...
Page 7: ...Overview 6 XT855 Operator s Manual CMW...
Page 21: ...Safety 20 XT855 Operator s Manual Emergency Procedures CMW...
Page 37: ...Controls 36 XT855 Operator s Manual CMW...
Page 61: ...Transport 60 XT855 Operator s Manual Tow CMW...
Page 104: ......
Page 105: ......
Page 106: ...XT855 Operator s Manual Service Record 105 CMW Service Record Service Performed Date Hours...
Page 107: ...CMW Service Record 106 XT855 Operator s Manual Service Performed Date Hours...