XT855 Operator’s Manual
Dig - 65
Digging
CMW
Digging
Single Inline Trench
1.
Position unit with tracks parallel with the intended
digging path.
2.
Fill and dump buckets.
3.
Reposition unit as needed to continue trench.
4.
When trench is finished, stow excavator, pivot seat
to face tool carrier end, switch unit into tool carrier
mode and drive away from trench.
Single Offset Trench
1.
Position unit near the intended digging path.
2.
Swing excavator and offset boom as needed to
align with digging path.
3.
Fill and dump buckets.
4.
Reposition unit as needed to continue trench.
5.
When trench is finished, stow excavator, pivot seat
to face tool carrier end, switch unit into tool carrier
mode and drive away from trench.
IMPORTANT:
If operator is facing excavator
when driving, unit movements are reversed.
IMPORTANT:
If operator is facing excavator
when driving, unit movements are reversed.
Summary of Contents for XT855
Page 1: ...XT855 Operator s Manual 053 1985 Issue 1 0 CMW...
Page 7: ...Overview 6 XT855 Operator s Manual CMW...
Page 21: ...Safety 20 XT855 Operator s Manual Emergency Procedures CMW...
Page 37: ...Controls 36 XT855 Operator s Manual CMW...
Page 61: ...Transport 60 XT855 Operator s Manual Tow CMW...
Page 104: ......
Page 105: ......
Page 106: ...XT855 Operator s Manual Service Record 105 CMW Service Record Service Performed Date Hours...
Page 107: ...CMW Service Record 106 XT855 Operator s Manual Service Performed Date Hours...