Prepare - 64
RT45 Operator’s Manual
Gather Information
Gather Information
A successful job begins before you dig. The first step in planning is reviewing information already available
about the job and jobsite.
Review Job Plan
Review blueprints or other plans. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.
Notify One-Call Services
Contact your local One-Call (811 in USA) or the One-Call referral number (888-258-0808 in USA and
Canada) to have underground utilities located before digging. Also contact any utilities that do not
participate in the One-Call service.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Summary of Contents for RT45
Page 1: ...RT45 Operator s Manual 053 1982 Issue 4 0 ...
Page 7: ...Overview 6 RT45 Operator s Manual ...
Page 70: ...RT45 Operator s Manual Drive 69 Drive Chapter Contents Start Unit 70 Drive 72 Shut Down 72 ...
Page 84: ...RT45 Operator s Manual Trench 83 Trench Chapter Contents Setup 84 Operation 85 ...
Page 99: ...Saw 98 RT45 Operator s Manual Operation ...
Page 105: ...Backhoe 104 RT45 Operator s Manual ...
Page 125: ...Microtrenching 124 RT45 Operator s Manual Operation ...
Page 136: ...RT45 Operator s Manual Service 135 Lubrication Overview Lubrication Overview ...
Page 175: ...Service 174 RT45 Operator s Manual As Needed ...
Page 193: ...Specifications 192 RT45 Operator s Manual MT12 MicroTrencher ...
Page 196: ......
Page 197: ......
Page 198: ...RT45 Operator s Manual Service Record 197 Service Record Service Performed Date Hours ...
Page 199: ...Service Record 198 RT45 Operator s Manual Service Performed Date Hours ...