HT25 - MAINTENANCE
81
GROUND DRIVE
HT25 - MAINTENANCE
81
GROUND DRIVE
Track Tension
Check
Check track tension every 10 hours. Measure length of spring as
shown. When tracks are correctly tensioned, spring should
measure 9 1/2 in (241 mm).
Adjust
To increase track tension, turn screw clockwise. To reduce track
tension, turn screw counterclockwise.
Track Tension
Check
Check track tension every 10 hours. Measure length of spring as
shown. When tracks are correctly tensioned, spring should
measure 9 1/2 in (241 mm).
Adjust
To increase track tension, turn screw clockwise. To reduce track
tension, turn screw counterclockwise.
Summary of Contents for ht25
Page 8: ...8 HT25 CONTENTS ...
Page 10: ...10 HT25 OVERVIEW ...
Page 34: ...34 HT25 SAFETY SAFETY ALERTS ...
Page 52: ...52 HT25 TRENCHING ...
Page 58: ...58 HT25 BACKHOE ...
Page 72: ...72 HT25 LUBRICATION ...
Page 92: ...92 HT25 MAINTENANCE ...
Page 101: ......
Page 102: ......
Page 103: ...HT25 103 ...