50
HT25 - TRENCHING
OPERATION
50
HT25 - TRENCHING
OPERATION
4.
Increase engine speed to full throttle.
5.
Slowly lower digging boom to desired trench depth.
6.
Raise backfill blade.
7.
Push track controls forward to trenching speed.
8.
When trench is complete, move track controls to neutral.
9.
Move throttle to half open.
10. Raise boom. As boom clears top of trench, move digging
chain control to neutral.
11. Drive forward, lower backfill blade and boom.
12. Move throttle to idle and let machine idle for three minutes to
cool engine.
13. Turn ignition switch to stop position.
4.
Increase engine speed to full throttle.
5.
Slowly lower digging boom to desired trench depth.
6.
Raise backfill blade.
7.
Push track controls forward to trenching speed.
8.
When trench is complete, move track controls to neutral.
9.
Move throttle to half open.
10. Raise boom. As boom clears top of trench, move digging
chain control to neutral.
11. Drive forward, lower backfill blade and boom.
12. Move throttle to idle and let machine idle for three minutes to
cool engine.
13. Turn ignition switch to stop position.
Summary of Contents for ht25
Page 8: ...8 HT25 CONTENTS ...
Page 10: ...10 HT25 OVERVIEW ...
Page 34: ...34 HT25 SAFETY SAFETY ALERTS ...
Page 52: ...52 HT25 TRENCHING ...
Page 58: ...58 HT25 BACKHOE ...
Page 72: ...72 HT25 LUBRICATION ...
Page 92: ...92 HT25 MAINTENANCE ...
Page 101: ......
Page 102: ......
Page 103: ...HT25 103 ...