background image

Tel: 0845 1238367    Fax: 01942 665104   e-mail: [email protected]   web: www.discreteheat.co.uk

I N S TA L L AT I O N

5.  CORNERS AND COVERS (continued)

Page  7

TM

Position holes in
knob as shown to 
access 2 fixing screws 
for TRV controls

NEW SLIM INTERNAL

AND EXTERNAL

CORNERS ARE NOW

AVAILABLE FOR THE

URBAN LT

See separate instructions supplied

Peel off Super Velcro

backing

Check back of cover

is clean and free

from grease

Pz x 2

Pz1

6.  FINAL CHECKS

TRV Unit

Return Manifold

Clockwise Installation 

Anti-clockwise Installation 

OFF 

AIR 

1 ~ 2 bar 

OFF 

A pressure test of the system before

connecting to the central heating

system is recommended.

(See part no. TTEST) 

OFF 

2

1

Material 

Output (per M @ dT50°C) 

Feed & Return 

Weight 

Capacity 

Corrosion 

Min. Flow 

Surface 

Complies 

Recommended

 

BTU / W 

Pipe 

Kg per m 

Litres per m 

Resistance 

Rate 

Finish 

with 

Max. Operating Temp.

Unique Polymer & 

TS/LT > 500BTU / 150W 

15mm 

1.4kg LT 

0.5 l/m 

Excellent 

10 c.c. per sec  Epoxy Powder 

BS-EN 

≤75°C

Aluminium Alloy 

OG > 700BTU / 210W 

16mm to order 

1.7kg OG 

 

See Section 8 

0.6 litre/min  to BS-EN 12206-1 

442 

 

PR > 450BTU / 135W 

 

1.2kg PR 

 

 ‘Running your system’

7.  TECHNIC AL SPECIFIC ATION

ON

ON

OFF

Clip return manifold 
cover top and bottom

Clip TRV Cover Top and Bottom

Note: TRV cover is completely secured by the 

Valve facia

RETURN MANIFOLD COVER FIXING (LT & TS)

TRV COVER FIXING (LT & TS)

1

2

1

2

Use correct size
screwdriver 
1/4” (6.5mm)
to avoid damage 

Use correct size

screwdriver 

1/4” (6.5mm)

to avoid damage 

Summary of Contents for ThermaSkirt

Page 1: ...t copies at www discreteheat co uk technical html TM 75mm 130mm FINISHED FLOOR LEVEL 35mm 90mm FLOW 15 16mm RETURN 15 16mm 45mm 100mm CLASSIC TS 6in 150mm THE SAME DIMENSIONS AND SPACINGS APPLY TO ANTI CLOCKWISE INSTALLATIONS ALL EXAMPLES SHOWN ARE CLOCKWISE RH INSTALLATIONS Remember to allow for carpet or tiles if NOT Finished Floor Level Your ThermaSkirt system must be cleansed and protected by ...

Page 2: ...TPI minimum PIPE CONNECTORS NEED TO BE SET INTO THE WALL FOR ALL TEMPLATESVISIT www discreteheat co uk technical html See pages 9 12 for pipe templates 130mm 65mm 120mm 90mm 60mm 95mm 100mm 45mm 65mm 130mm DOUBLE TRV INSTALLATION TEMPLATE Sheet 1 of 2 Through floor pipework Left and right feed DO NOT SCALE DRGWHEN PRINTING 75mm 0 20 40 mm CLOCKWISE SHOWN 150mm BI DIRECTIONAL TRV Relieve plasterwor...

Page 3: ...er and configuration of clips IMPORTANT ALL CUT ENDS MUST BE DEBURRED AS SHOWN BELOW IMPORTANT All cut ends MUST be deburred to preserve your warranty Remove all chaff and debris to preserve your warranty Problems may occur if not properly removed Internal corner External corner Return manifold Odd angle internal Odd angle external In line joint 6m walls Door architrave kit Non TRV feed return thr...

Page 4: ...RK TOP OF SKIRTING WITHOUT CAULKING STRIP OR SHOULDYOU NEED TO MOVE THE SKIRTING PEEL AWAY FROM BRACKETS AS SHOWN DO NOT TILT UP OR DOWN 100mm from end of skirting 600mm 700mm Insulating foil if required Part No INSRL LT INSRLTS or INSRL OG older solid walls without cavity 5mm 700mm approx 7mm Ø Gently push each piece back to the wall and assess wall straightness if there any gaps greater than 10m...

Page 5: ...ARE TO THE SKIRTING START WITH TRV AT FEED AND RETURN PIPE END O RINGS MUST BE GREASED O RINGS MUST BE GREASED GREASE SUPPLIED MUST BE USED ON ALL CONNECTORS TO AVOID DAMAGE ON ASSEMBLY AND PRESERVE YOUR WARRANTY O RINGS MUST BE GREASED CONTINUE ROUND THE ROOM REFERRING TO CORRECT CLIP SEQUENCE ON PAGE 3 4 INSTALLATION SEQUENCE 7mm Ø 60 1000mm apart ALL OTHER INFORMATION FOR SPACING BENDING ETC IS...

Page 6: ...p to retain the final section CHECKTHATTHE FINAL PIECE CANNOT COME OFF UNDER PRESSURE If a return manifold follows an internal corner double clips must be used FITTING FINAL SECTION 5 CORNERS AND COVERS ENSURE BOTH SIDES ARE LEVEL WITH EACH OTHER See separate instructions provided with Regency OG Deco PR 1 2 Mitre top gaskets before fitting corner cover TOP TIP Soak top gasket in warm soapy water ...

Page 7: ...em is recommended See part no TTEST OFF 2 1 Material Output per M dT50 C Feed Return Weight Capacity Corrosion Min Flow Surface Complies Recommended BTU W Pipe Kg per m Litres per m Resistance Rate Finish with Max OperatingTemp Unique Polymer TS LT 500BTU 150W 15mm 1 4kg LT 0 5 l m Excellent 10 c c per sec Epoxy Powder BS EN 75 C AluminiumAlloy OG 700BTU 210W 16mm to order 1 7kg OG See Section 8 0...

Page 8: ...position Noise ticks clicks when heat on Connectors fittings rubbing on wall Relieve plasterwork at Feed Return and or corner fittings Sudden bangs ThermaSkirt length s cut too long Check lengths refit if necessary expanding and jumping off the bracket Internal corners clipped both sides Check remove unclip unecessary clip TRV Unit Trapped air expelled through boiler Auto vent recommended to ease ...

Page 9: ...EL WALL FINISHED FLOOR LEVEL 0 20 40 mm Drill 2 x 18mm holes See sheet 2 for location 130mm 65mm 120mm 90mm 60mm 95mm 100mm 45mm Relieve plaster surface finish to a depth of 5mm in this shaded area to allow for Tectite fittings Relieve plaster surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting 65mm 130mm DOUBLE TRV INSTALLATION TEMPLATE Sheet...

Page 10: ...END RH END WALL WALL FINISHED FLOOR LEVEL FINISHED FLOOR LEVEL WALL FINISHED FLOOR LEVEL 130mm OG 75mm OG 100mm LT 90mm PR 45mm LT 35mm PR Drill 2 x 18mm holes See sheet 2 for location 130mm 65mm 120mm 90mm 60mm 95mm 100mm 45mm Relieve plaster surface finish to a depth of 5mm in this shaded area to allow for Tectite fittings Relieve plaster surface finish to a depth of 25mm in this dark shaded are...

Page 11: ...m 95mm 100mm 45mm Relieve plaster rface finish to a pth of 5mm in is shaded area to allow for Tectite fittings Relieve plaster surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting 65mm 130mm DOUBLE TRV INSTALLATION TEMPLATE Sheet 1 of 2 Through floor pipework Left and right feed DO NOT SCALE DRG WHEN PRINTING 75mm Cut fold along here for Urban ...

Page 12: ...plaster rface finish to a pth of 5mm in is shaded area to allow for Tectite fittings Relieve plaster surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting 65mm 130mm DOUBLE TRV INSTALLATION TEMPLATE Sheet 1 of 2 Through floor pipework Left and right feed DO NOT SCALE DRG WHEN PRINTING 75mm Cut fold along here for Urban LT template Cut fold along...

Reviews: