Sectio
5-10
Ref
5.11 S
1) Driv
2) Be
3) Rem
4) At
G
Pus
5) If
n
and
5.12 L
Lifting
1) Ref
2) Plac
3) Rem
4) Pro
leve
If it beco
that the
Diagram
on5-Oper
fer to
Sectio
Shut Dow
ve machine
sure the ma
move all loa
Ground Con
sh down the
ecessary, c
d operating c
Lifting an
Operation
fer to the Se
ce the boom
move all loo
operly adjust
el.
omes neces
lifting device
m)
LIFTING E
SLAB. EA
MACHINE
LEVEL WH
ration Inst
on 3.3
, Osci
wn and P
to a reasona
ain boom is f
d from the p
ntrols, turn
Emergency
over Platfor
controls from
nd Tie Do
n
erial Number
m in the stow
se items fro
t the rigging
sary to lift th
es are attac
EYES ARE p
ACH OF THE
E MUST BE A
HEN ELEVA
truction
Ding
llating Axle L
Parking
ably well pro
fully retracte
platform.
Ground and
y Stop Switc
rm Control c
m hostile env
own
r Tag, to ma
wed position
om the mach
g to prevent
he machine
ched only to
provided AT
E FOUR CH
ADJUSTED
ATED.
Op
gli Mach
Lockout Tes
otected area
ed and lowe
d Platform C
ch. Withdraw
console to p
vironment.
ke sure the
.
hine.
damage to
using an ov
the designa
T THE FRO
HAINS OR S
D INDIVIDUA
eration &
inery
st (If Equippe
a.
red.
Console Se
w the key.
protect instru
Gross Vehic
the machin
verhead or m
ated lifting ey
ONT AND RE
SLINGS USE
ALLY SO M
& Mainte
ed) for proce
lecting Swit
uction placa
cle Weight.
ne and so th
mobile crane
yes. (See Fi
EAR IN THE
ED FOR LIF
MACHINE RE
enance M
edure.
tch to OFF
ards, warnin
he machine
e, it is very im
igure 5-3. Li
E FRAME
FTING
EMAINS
Manual
position.
g decals
remains
mportant
fting