
DinLOG – User Manual
Page | 10
Rev 1.6
2.4. Installation instructions
IMPORTANT: DISCONNECT THE BATTERY PRIOR TO THE INSTALLATION!
2.4.1. LogBase 04 installation
The LogBase 04 is to be vertically mounted (i.e., its connector positioned downwards), securely fixed and
installed in a position protected against water, excessive heat, and mechanical shock.
The device has two mounting holes, one on each side, with the pressure connection and device connector
being located next to each other.
The connector plug on the logger connects to the cable harness and has a security lock to prevent unwanted
disconnection. To remove the connector from the plug, press the black locking tab firmly and pull connector
from the plug.
Figure 2.9.
LogBase 04 front panel connections
2.4.1.1. Pinout
LogBase 04 pinout is listed below:
Pin
number
Pin description
Wire color
1
Temperature sensor P
(green)
2
Temperature sensor N
(white)
3
Input / Output or RPM
(white / black)
4
KL30 / B+
(red)
5
CAN L
(green)
6
CAN H
(white)
7
KL15 / Ignition switch
(red / black)
8
KL31 / Ground
(black)
Table 2.2.
LogBase 04 pinout