background image

25. Replace the element which had been removed by carefully passing 
the ends through the base insulation slots into the terminal blocks below. 
Position the insulator on the element end in contact with the terminal block 
ceramic as shown, and tighten the connection screws. At this point check 
that all element connections are tight.

26. Fit the front bricks with the airways facing inwards

27. Re-" t the front panel/insulation assembly, ensuring the bottom edge 
of the panel is located behind the base ! ange.

28.  Make  sure  all  screws  removed  in  operation  20  are  replaced 
securely.

29. Replace the spacer nut, washer and screw removed in 18 and reconnect 
the two quick connect terminals removed in 19.

30. Connect the off peak supply to the storage terminal block at the right 
side of the base panel.
Replace the convector terminal block and insulation card at the left side 
of  the  base  panel,  clip  wires  running  across  heater  and  connect  peak 
supply.

HEAT RESISTING CABLE MUST BE USED.
NOTE

: ON NO ACCOUNT SHOULD SURPLUS CABLE BE STUFFED 

INSIDE THE HEATER. 

Make sure clamp is tightening on outer sheath 

of cable and not on individual conductors.
WARNING

:  THIS  APPLIANCE  MUST  BE  EARTHED.  CHECK  ALL 

ELECTRICAL CONNECTIONS FOR TIGHTNESS.  

ENSURE THAT CABLE CLAMP IS 
SECURELY ATTACHED TO THE 
CHASSIS OF THE HEATER.

Summary of Contents for CXLS24

Page 1: ...e heater Only heat resisting cable minimum rating T85 should be used If used in a bathroom the heater must be installed such that switches and other controls cannot be touched by a person in the bath...

Page 2: ...each end packaging piece Stand heater on its feet and remove all packaging pieces 5 Position heater against wall in intended nal position taking note of the minimum xing dimensions given below If tted...

Page 3: ...than the length of the plastic insert so that the xing is made below the plaster layer 12 Low Density Block Walls A specialised xing such as the Uni x LB70 should be employed following closely the ma...

Page 4: ...the following must be strictly adhered to a For skirtings higher than 100mm 4 it will be necessary to position the heater with the screws attached through the alternative xing slots to the front b Fo...

Page 5: ...l packing by sliding it up and off the elements taking care not to damage the insulation 23 Remove one element to allow access for the back row of bricks On the CXL24N CXLS24N remove the element to ri...

Page 6: ...n 20 are replaced securely 29 Replace the spacer nut washer and screw removed in 18 and reconnect the two quick connect terminals removed in 19 30 Connect the off peak supply to the storage terminal b...

Page 7: ...ircuit 900W 1450W 2000W Note if the heater is situated underneath a shelf or overhand up to 250mm high then the brown wire should remain in circuit 33 Holding the bottom edge if the front panel toward...

Page 8: ...AIR SENSING STAT Peak Circuit Diagram CXL24N CXLS24N BROWN BROWN CUT OUT MAUVE BLUE BLUE BLUE BROWN MAUVE BROWN CONVECTOR ELEMENT CONVECTOR ELEMENT ELEMENT SELECTOR BLOCK MAINS BLOCK L SWITCH NEON AI...

Reviews: