D-FORCE600VA SLIDING GATE OPERATOR
fasten the operator.
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut
Fig.2
Operator base (see Fig.3)
After the concrete has hardened, mount the gate operator base to the
concrete pad. Verify that the base is properly leveled.
Using bolts and washers mount the gate operator to the base and insert the
cover. Check the operator and make sure it is lined up with the gate.
6
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut