7
DECserver 900GM Installation
Installing the Module
The module hot-swap feature allows you to install the module into the DEChub
900 without turning off power to the DEChub 900. Seating the module initiates
the powerup sequence if enough power is available.
WARNING
!
To avoid personal injury or damage to equipment, do not
install the module into a DEChub 900 or DEChub ONE
unless the module is completely assembled, with the enclo-
sure, bezel, and all faceplates in place.
1
Compare your module’s power
requirements with the values
shown in the Hub Manager status
display (see examples).
NOTE:
The 12V power in the DEChub 900 is derived from the 15V power source.
Although it is listed separately in the product specifications, the 12V
requirements are included in the 15V power total.
Module’s Manufacturing
Label (Example)
If any of the module’s power require-
ments exceed the values shown in
the status display, add another pow-
er supply (see the
DEChub 900
MultiSwitch Owner’s Manual).
Hub Manager Status
Display (Example)
LKG–9062–94I
Available: 90.5 W
5V: 13.0 A, 15V: 3.5 A
20.0 W
5 V
12 V
15 V
4.0 A
0.1 A
0.5 A