This section provides the information required for
this counting system
for operation. The following steps
1. Unpacking
2. Set-up Procedure
Unpacking
Each component of the
system is packed in a specially designed
each component from its carton, separate the component from
shell assembly and set aside. Inspect the carton
to be sure
that all accessories have been removed from the
Inspect the carton inner
panels for accessories.
NOTE: Be sure to repack all materials
the carton set. Store the cartons in
A secure area so they can be available whenever future shipment of the scale is
required.
3.2. Inspection
Immediately after
a visual inspection of the
should be performed.
If any damage has been incurred during transportation notify the shipper and DIGI
MATEX, INC. immediately. Instructions for
of damage and further
procedures will then be determined.
If, at anytime, the
counting scale must be returned for modification,
calibration, or repair, be sure that it is properly packed with
materials.
Whenever possible, the original carton assembly
be retained for this
Any damage
by improper
not be
by
warranty.
3.4. Unlocking
T h e unfocking p r o c e d u r e is included on t h e next p a g e . The DC-190 should
be properly locked whenever it is being transported.
DC-190 OPERATION
9
All manuals and user guides at all-guides.com
Summary of Contents for DC-190 ULTRA COUNT
Page 2: ...All manuals and user guides at all guides com ...
Page 12: ...DC 190 OPERATION EV03 DOC All manuals and user guides at all guides com ...
Page 65: ...All manuals and user guides at all guides com ...
Page 77: ...Shop Notes 75 All manuals and user guides at all guides com ...
Page 78: ...Shop Notes 76 All manuals and user guides at all guides com ...