10
PM-000100-D PDD - PD50 Service and Repair Manual - October 2017
BEARING PRELOAD CHART
PD UNIT
HOUSING
SHAFT DIA
(mm)
FORCE (Kg)
PDD, PDX, PDX2
PDX3, PD3
& PD5
S2
50.8
4
PD6 - PD12
S4
70
7
S4 (RME)
70/75
10
S4
75
15
PD15 - PD22
S5
100
30
S6
100
30
PD25-PD50
S8
120
35
S9.5
120
35
S10
150
45
S12
180
55
FORCE (in Kg
)
This is the force to keep the housing spinning slowly at a
constant speed. The force required to start the spinning initially
will be greater. This is not the correct reading. To ensure an
accurate reading the force direction must be held at 90 degrees.
(As shown). Reading is to be taken from the inner bolt pattern.
FORCE (in Kg)
This is the force to keep the housing spinning slowly at a constant speed.
The force required to start the spinning initially will be greater. This is not the correct reading.
To ensure an accurate reading the force direction must be held at 90 degrees. (As shown)
Reading is to be taken from the inner bolt pattern.
BEARING PRELOAD FORCE CHART
PD UNIT
Housing Shaft DIA (mm) Force (Kg)
PDD,PDX,PDX2,PDX3
,PD3 - PD5
S2
50.8
4
PD6 - PD12
S4
70
7
S4 (RME)
70/75
10
S4
75
15
PD15 - PD22
S5
100
30
S6
100
30
PD25 - PD50
S8
120
35
S9.5
120
35
S10
150
45
S12
180
55
Summary of Contents for PDD-PD50
Page 1: ...1 AUGER DRIVES PDD PD50 SERVICE REPAIR MANUAL PM 000100 D...
Page 11: ...11 PDD POST AUGUST 2013 6 2 1 5 1 8 4 9 7 3 15 10 11 12 16 13 14...
Page 17: ...17 2 4 10 3 9 13 13 6 11 1 12 8 1 7 5 PD3 PD4 PD5 19 15 16 20 18 14 17 3...
Page 69: ...69 Australian Designed and Manufactured PM 000100 D...