2.3 Heat load, gas connection values, combustion requirement, exhaust quantity
Type
Heat loader
Gas connection value
Combustion
requirement
Exhaust
quantity
Full fire
Minor
fire
Earth gas E
Earth gas H
(G20)
HuB 9,45 kWh/m
3
Earth gas L
Earth gas LL
(G 25)
HuB 8,12 kWh/m
3
Liquid gas
(G 30/G 31)
HuB 12,68 kWh/kg
TP-JG 12/G
10 kW
2,8 kW
1,06 m
3
/h
1,23 m
3
/h
0,79 kg/h
11,2 m
3
/h
12,2 m
3
/h
TP-JG 15/G
15 kW
5,6 kW
1,59 m
3
/h
1,85 m
3
/h
1,18 kg/h
16,8 m
3
/h
18,3 m
3
/h
TP-JG 18/G
15 kW
5,6 kW
1,59 m
3
/h
1,85 m
3
/h
1,18 kg/h
16,8 m
3
/h
18,3 m
3
/h
TP-12 / G
10 kW
4 kW
1,06 m
3
/h
1,23 m
3
/h
0,79 kg/h
11,2 m
3
/h
12,2 m
3
/h
TP-15 / G
10 kW
4 kW
1,06 m
3
/h
1,23 m
3
/h
0,79 kg/h
11,2 m
3
/h
12,2 m
3
/h
TP-18 / G
10 kW
4 kW
1,06 m
3
/h
1,23 m
3
/h
0,79 kg/h
11,2 m
3
/h
12,2 m
3
/h
The small combustion load is 2.8 kW for TP-JG… /G each burner and 4.0 kW for TP- /G each burner.
This results in the following FLOW VALUES each burner:
TP-JG.../G
TP-…/G
Earth gas H, E (G20)
0,30 m
3
/h
0,48 m
3
/h
Earth gas L, LL (G25)
0,34 m
3
/h
0,55 m
3
/h
Liquid gas (G30)/(G31)
0,22 kg/h
0,35 kg/h
The machine is working with full fire with fixed nozzles without pre-adjustment.
For the pilot flame the small combustion quantity is regulated for liquid gas with fixed nozzles. For earthgas the
nozzles are adjusted.