
JINDLE04 Rev B 15/09/15
I
NSTALLATION
P
ROCEDURE
Note: If installing the direct air kit, follow the
instructions supplied with the kit before
proceeding.
1.
If installing against a combustible wall, fit
the heat shield to the rear of the stove.
2.
Offer the stove into position and adjust the
levelling feet as required.
3.
Connect the flue, ensuring all joints are
sound.
C
OMMISSIONING
Upon completion of the installation allow a
suitable period of time for any fire cement and
mortar to dry out. A small fire may then be lit and
the installation checked to ensure the smoke and
fumes are drawn up the flue and emitted safely to
atmosphere. The stove should not be run at full
output for at least 24 hours.
Read the Operating
Instructions before lighting the stove for the first
time.
Leave the instructions and operating tool(s) with
the customer and advise them on -
Correct use of the appliance
The recommended fuel
Action to be taken should smoke or fumes
be emitted from the stove or installation.
The use of a fireguard when the stove is
used in the presence of children or the
infirm.