2. INSTALLATION
Page 5
© 2008 DH Instruments, a Fluke Company
2
2
.
.
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
2.1
UNPACKING AND INSPECTION
GB-H-152-70M and GB-H-152-100M are delivered enclosed in plastic film and secured in place in a
wooden crate. All ports are plugged, the drive air valve is closed and pressure regulators are set to zero.
Remove the instrument from the shipping crate and plastic bag. Take care not to lose or discard the
accessories that are included.
Remove all plastic plugs from the fittings and inspect for damage and contamination.
Inspect for any missing components or accessories using Table 1. Should any items be missing, contact
DHI
or you local supplier.
Table 1.
GB-H-152-70M and GB-H-152-100M Parts List
DESCRIPTION
PART #
1 ea.
GB-H-152-70M gas booster package
or
GB-H-152-100M gas booster package
402387
or
402379
ACCESSORIES:
1 ea.
Operation and Maintenance Manual
550162
INTERCONNECTIONS KIT:
402390
1 ea.
Tube weld, 1.5 m (60 in.) x 1/8 in. (3 mm) with DH500 tips (coiled)
402506
1 ea.
Adaptor, 1/8 in. M x 1/4 in. Swage
102033
200 cm.
1/4 in. PFA tubing
101450-Z
1 ea.
Nut, 1/4 in. Swage
100247
1 ea.
Ferrule, front, 1/4 in. Swage
100248
1 ea.
Ferrule, rear, 1/4 in. Swage
100249