Energy Star Compliant System Board
Step 5
Insert the HSIM modules into the HSIMM banks on the
G486-EVB. The quantity and location of the HSIM
modules are dependent upon the memory configuration
and type of modules you intend to use.
Step 6
Set the appropriate jumpers.
Step 7
Install the prepared G486-EVB system board into the
case and replace the screws.
Step 8
Reinstall all cards and connectors and replace the sys-
tem unit cover. Reconnect all power cords and cables.
2-26
u
Installation Overview