Installation/User
Manual
12
Microinverter
system
operating
instructions
To
operate
the
microinverter
PV
system:
1.
Turn
ON
the
AC
circuit
breaker
on
each
microinverter
AC
branch
circuit.
2.
Turn
ON
the
main
utility-grid
AC
circuit
breaker.
Your
system
will
start
producing
power
after
a
one-minute
waiting
time.
3.
The
units
should
start
blinking
red
one
minutes
after
turning
on
the
AC
circuit
breaker.Then
blue led blinking.
This
means
they
are
producing
power
normally,
the
faster
blinking of the blue led
means more power generated.
4.
Plug
in
the
ECD
and
follow
the
instructions
according
to
the
manual
for
the
ECD.
5.
The
Microinverters
will
start
to
send
performance
data
over
power
line
to
the
ECD.
The
time
required
for
all
the
Microinverters
in
the
system
to
report
to
the
ECD
will
vary
with
the
number
of
Microinverters
in
the
system.
You
can
verify
proper
operation
of
the
Microinverters
via
the
ECD.
See
the
ECD
Installation
and
Operation
Manual
for
more
information.
NOTE:
Once AC power is applied, about 0.1A current and 25VA(W)
power for each microinverter may be measured with a meter. This
Current and Power are Reactive. The inverters ARE NOT operating.
After an over 60s waiting time, the inverters will start operation.