Installation/User
Manual
11
Installation Procedures
Step
4
-
Install
a
AC
cable
protective
end
cap
at
the
end
of
AC
cable
Step
5
-
Connect
Microinverters
to
the
PV
Modules
NOTE:
When
plugging
in
the
DC
cables,
the
Microinverter
should
immediately
blink
one
quick
red
and
three
short
green.
This
will
happen
as
soon
as
the
cables
are
plugged
in
and
will
show
that
the
Microinverter
is
functioning
correctly.
This
entire
check
function
will
start
and
end
within
5
seconds
of
plugging
in
the
unit,
so
pay
careful
attention
to
these
lights
when
connecting
the
DC
cables.
WARNING:
Double check to make sure all of the AC and DC wiring
has been correctly installed. Ensure that none of the AC and/or DC
wires are pinched or damaged. Make sure that all of the junction
boxes are properly closed.