-17-
5.3 Visual Inspection of the Connection
After connecting the battery, check for:
Usage of positive and negative cables.
Connection of the positive and negative terminals.
All the bolts are tightened.
Cables fixation and the appearance.
The setting of the dialing address.
The installation of the protecting cover.
6. Activate the Product
6.1 Start the Battery
After installation, wiring, and configuration are completed, you must check all the connection. When
the connections are correctly, and then press power button to activate the battery. The green working
light on the front panel of the battery flashes, indicating that the battery system is normal.
7.
Inspection, Cleaning and Maintenance
7.1 General Information
The battery product is not fully charged. It is recommended that the installation be completed
within 3 months after arrival;
During the maintenance process, do not re-install the battery in the battery product. Otherwise,
the performance of the battery will be reduced;
It is forbidden to dismantle any battery in the battery product, and it is forbidden to dissect the
battery;
After the battery product is over-discharged, it is recommended to charge the battery within 48
hours. The battery product can also be charged in parallel. After the battery product is
connected in parallel, the charger only needs to connect the output port of any product battery.
Never attempt to open or dismantle the battery! The inside of the battery does not contain
serviceable parts.
Disconnect the Li-Ion battery from all loads and charging devices before performing cleaning
and maintenance activities
Place the enclosed protective caps over the terminals before cleaning and maintenance